Learn about the ongoing 公共工程 and 设施 repair projects to county roads, right of ways and facilities from damage caused by Hurricane Ian.
Last Updated: 10/14/2024 Category: 巷道 当前阶段: 设计 Development
吉尔特 Blvd roadway reconstructionLast Updated: 10/14/2024 Category: 巷道 当前阶段: 设计 Development
Widen Kings Highway to a 4 lane divided roadwayPeachland Boulevard at Harbor Boulevard Intersection Improvments
Last Updated: 10/14/2024 Category: 巷道 Category: 人行道上 当前阶段: 设计 Development
The design and construction of new turn lanes and traffic signal modifications at the intersection of Peachland Boulevard and Harbor Boulevard.
Last Updated: 10/14/2024 Category: 巷道 当前阶段: 设计 Development
Sandhill Blvd WideningVeterans Boulevard Intersection Improvements
Last Updated: 10/14/2024 Category: 巷道 当前阶段: 设计 Development
The design and construction of new turn lanes and sidewalk modifications at various intersections along Veterans Boulevard.
Placida West Boat Ramp Expansion
Last Updated: 10/04/2024 Category: 公园 And 娱乐 Category: Sales Tax Funded 当前阶段: 设计 Development
A 2014 Tier 2 Sales Tax project. The Placida Boat Ramp West Expansion project develops the property adjacent to the existing boat ramp to add features including a new two-lane boat ramp, kayak发射, 厕所, 和停车.Alligator Creek Maintenance Dredge
Last Updated: 10/03/2024 Category: 沿海 当前阶段: 设计 Development
设计, 许可证, 疏浚, and construction oversight for project certification of a maintenance 疏浚 event of Alligator Creek channel.
Buena Vista Waterways Dredging Project
Last Updated: 10/03/2024 Category: 沿海 当前阶段: 建设
The Buena Vista Waterway Committee requested and received a dredging of the access and connector channels in 2016. 从那时起, new concerns of a need to restore safe navigation have been brought to the County’s attention.
Gulf Cove Interior Canal design and maintenance 疏浚 project
Last Updated: 10/03/2024 Category: 沿海 当前阶段: 设计 Development
Gulf Cove Interior Canal bathymetric survey and design project to -4'MLW. Gulf Cove Waterway MSBU requested work.